- Designed the 1415 gpm at 228 TDH lift station to meet the existing needs of the Kennedy Road Middle School, which was built without sewer capacity.
- The 8-inch forcemain of ductile iron included a large static head to overcome and was bored under eight cross country gas mains – demonstrating PCG’s attention to detail.